How to Build

How to Build ??!

1-White blocks should be sprayed with water before use to be wet during construction.

2-The walls should be sprayed with water three consecutive days twice a day after construction, especially on hot days.

3-To ensure thermal insulation is completed, the Shamlan has a ready-to-use armed door for door and window openings as required.

4-Used mortar:

ü      Regular mortar

ü      Regular mortar with lime

ü      Shamlan mortar

 

Our Projects

United Arab Emirates Branch

Dubai- Sheikh Zayed St .VS hotel Alforment.

Mob No:  00971503654815 --- 00971566991566

Qatar Branch

Doha –Cornice- Al wakra  Tower  Fl 9

Mob No:  0097433402617

Our location on the map

Saudi Arabia

Eastern Province – Al-Ahsaa

TEL / 00966135754041

Mob / 00966542231000 – 00966534563076 – 00966534563139

FaX / 00966135759302